20 November 2013

TOILE DAIRY

UPDATE

Lined patch pocket 

 placing the pockets on the stand




 Attaching the straps- pinned on the stand


cross stitch to ensure its secure and holds a good amount of weight






with guttering 

water bags in the pockets 





 Attaching the tubing


Trail run on scraps


 3 holes drilled through using a big scary drilling machine which I did haha


 Tubes attached



Up to now this is where I am up to and Im very nearly complete woooo

oxo

No comments: